Re: jercasche's 64 f100 swb
Posted: August 15, 2021, 1:02 pm
I keep picking away at the upgrades to the interior. A new rubber floor mat was ordered and will hopefully be installed soon. The entire dash was scuffed and top coated. It is taking a little bit longer to get put back together but should be done soon as well. An additional lap belt was bought to give 3 seat belts. Hopefully the bench seat will go back in and stay for a long time.
A new vent line for the PCV valve was hooked up and plumbed into the carb spacer. It was left unhooked for a while. The carb will need to be adjusted for the new air ratio. There is a car show next weekend so some much needed shining up is in order.
A new vent line for the PCV valve was hooked up and plumbed into the carb spacer. It was left unhooked for a while. The carb will need to be adjusted for the new air ratio. There is a car show next weekend so some much needed shining up is in order.